PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolting at Derrick -4 (4th Floor) Facing South-West (800x600).jpg Electric conduit at Elev. 5,6 Facing West (800x600).jpg Excavation for the trench drain rebar boxes Facing West (800x600).jpg Pour concrete at Column C-1 Facing South (800x600).jpg Pour concrete at column D-1 Facing South  (800x600).jpg Pour concrete at Stair -2 slab Facing West  (800x600).jpg Pour concrete at Stair -4 slab Facing East (800x600).jpg Started installing steel angles around Derrick -7 (2nd Floor) Facing North-West (800x600).jpg